Fast Planning Software doesn't bolt on connectors. The sales plan, BOM explosion, work orders, purchase requisitions and stock reservations all ride the same BOM, stock and item master as Fast Production and Fast Inventory — so the integrations are table-level links, not brittle external interfaces. Add WhatsApp, email and SMS alerts on the events, Dhruv AI over the data and an IoT machine-data layer under the shop floor, and the plan talks to the whole plant without middleware.
Each one reads and writes the same live data as the MRP explosion & netting and scheduling & priority engine — covered by the same audit trail as every planning document.
The plan reaches the people who act on it. Alerts fire from real planning events — a plan released, a work order or purchase requisition raised, a stock item crossing its reorder level, a schedule or priority change, a delay or overload warning — on WhatsApp, email, SMS or a combination. Planners, buyers, stores and supervisors get what they need, when it matters, without opening a report.
Explore alertsThe Fast Suite's own AI and BI module, wired into your live planning data. Role dashboards over machine load, plan-vs-actual and OEE; AI-written insight summaries; plain-English questions answered through a read-only security sandbox — SELECT-only, whitelisted analytical views. It also clusters free-text delay and breakdown-cause remarks into the recurring themes that keep pushing your schedule out, ranked by machine and order.
Explore Dhruv AIThe data layer under the planning engine. Book process status by scanning shift, machine and operator barcodes; capture machine data automatically — start and end times of operations, parameters like temperature and pressure; run Pick-to-Light for inventory visibility. Real-time, paperless shop-floor booking feeds live machine status and OEE straight back into the plan, so plan-vs-actual reflects the floor, not yesterday's paperwork.
Explore IoT dataThe execution handoff. Generated Work Orders flow into Fast Production, which reports completion and consumption back; buy-side net requirements and reorder suggestions become Purchase Requisitions consumed by Fast Purchase (PR→PO→GRN, feeding open-PO back into netting); every MRP run reads live Fast Inventory stock and can reserve it against a plan. One shared BOM, stock and item master — plan to shop floor with no interface.
Explore the handoffFast Planning shares one platform and one database engine with the other Fast products. When they run together, the plan connects to sales demand, machine uptime and inspection without an interface layer — for manufacturers of every kind, cloud or on-premise, across India and worldwide.
A confirmed order acceptance becomes the demand that seeds the sales plan — a make-to-order job carries its own order-specific BOM. Sales, planning and production read the same customer and item masters, so demand flows into MRP without re-entry, and the plan always reflects the order book.
fastcrmsoftware.comFinite capacity is only real if the machine is running. Fast Maintenance keeps preventive schedules and breakdown history against the same machines your machine loading and Gantt schedule load operations onto — so planned downtime and breakdowns are visible when you sequence the plan, not discovered on the floor.
fastmaintenancesoftware.comWhat the plan makes and buys has to pass. Fast Quality inspects incoming bought-out material and in-process and finished production against the same item master, and rework or rejection feeds back into net requirements — so the next planning run accounts for what was scrapped, not just what was scheduled.
fasttqmsoftware.comStandalone-capable by design. Everything a planner needs — sales plan, BOM explosion, netting against stock and open supply, work-order and purchase-requisition generation, machine loading, Gantt scheduling and plan-vs-actual — is inside Fast Planning Software itself. The Production, Inventory and Purchase links switch on when those products are licensed; WhatsApp/email/SMS alerts, Dhruv AI and the IoT machine-data layer work either way.
In a 30-minute demo we'll take demand to a netted plan, raise a work order and a purchase requisition, reserve stock — and watch the alerts, the IoT booking and the analytics follow along.